英语翻译本次设计共九章,分别是总论、技术经济、矿山地质、采矿、开采斜坡道设计、矿井通风设计、矿山机械、总图运输、安全专篇

问题描述:

英语翻译
本次设计共九章,分别是总论、技术经济、矿山地质、采矿、开采斜坡道设计、矿井通风设计、矿山机械、总图运输、安全专篇.其中采矿、矿山机械、开采斜坡道工程是设计的主体,采矿中采用了先进的低贫损无底柱分段崩落法,将产生巨大的经济效益,专题开采斜坡道工程,主要包括斜坡道位置的确定、斜坡道形式的选择、斜坡道的断面规格、斜坡道坡度、斜坡道弯道设计、斜坡道施工等方面的内容.一些部分的设计包含必要的图纸,图纸必须按照有关规定绘制.
1个回答 分类:英语 2014-12-06

问题解答:

我来补答
This design altogether nine chapters,respectively are the general remarks,the technical economy,the mining geology,mining,the mining slope ramp design,the mine ventilation design,the mining machinery,the assembly drawing transportation,safe specially.And mining,the mining machinery,the mining slope ramp project are the design main bodies,in mining used advanced low poor has damaged the non-lower column partition to come down the law,will have the huge economic efficiency,the special mining slope ramp project,mainly included the slope ramp position the determination,the slope ramp form choice,the slope ramp cross section specification,the slope ramp slope,slope ramp aspect and so on curve design,slope ramp construction contents.Some parts of designs contain the essential blueprint,the blueprint must defer to the concerned requirements plan.
 
 
展开全文阅读
剩余:2000