问题描述:
英语翻译
打问号的是看不清楚的.
12 Holes equispaced to be Pilot Drilled Φ80 together with the Stub Shaft (To be finally reamed to Φ82,55 (3 1 /4") on site assy.)
Notes:
1.Surface finish (中间是数字)all over &(数字)w?ere shown
No tool marks permitted on Shaft &Stub Shaft.
2.All Radii to be (数字) &Free From Tool Marks or undercuts.
3.Break all sharp corners.
4.Quality Status - Critical.
5.Q.C.P.Allocated.
6.Shaft details taken from FH&B Drawing for N'Kana
Rock Hoist (S.O.B.Shaft )Ref.No.8-58-90
打问号的是看不清楚的.
12 Holes equispaced to be Pilot Drilled Φ80 together with the Stub Shaft (To be finally reamed to Φ82,55 (3 1 /4") on site assy.)
Notes:
1.Surface finish (中间是数字)all over &(数字)w?ere shown
No tool marks permitted on Shaft &Stub Shaft.
2.All Radii to be (数字) &Free From Tool Marks or undercuts.
3.Break all sharp corners.
4.Quality Status - Critical.
5.Q.C.P.Allocated.
6.Shaft details taken from FH&B Drawing for N'Kana
Rock Hoist (S.O.B.Shaft )Ref.No.8-58-90
问题解答:
我来补答展开全文阅读