英语翻译4.3 供电本项目将采用水泥厂余热发电工程以及燃煤热电厂供电,当地电网作为备用电源,考虑将来发电与当地并网销售的

问题描述:

英语翻译
4.3 供电本项目将采用水泥厂余热发电工程以及燃煤热电厂供电,当地电网作为备用电源,考虑将来发电与当地并网销售的可能.备用供电电源33kV由赞比亚国家电网公司单回路架空引入本项目总降变电所.
1个回答 分类:综合 2014-09-20

问题解答:

我来补答
4.3 The power supply for this project shall adopt the source from the waste heat power generation project and coal-fired power plant; the local power grid will be used as a reserve power source. The possibility of connecting the generated power to the local grid for sales will also be considered. The reserve 33 kV power source will be joined to the main step-down substation with single-loop overhead cable by the Zambian State Grid Corporation.
 
 