问题描述:
请帮忙翻译成英文,怎么样翻译最合适呢?
The Contractor shall give adequate notice to the Engineer when specific
actions are required by others without which, the construction cannot be executed on schedule. The notification shall identify the current status of the affected design.
The Contractor shall give adequate notice to the Engineer when specific
actions are required by others without which, the construction cannot be executed on schedule. The notification shall identify the current status of the affected design.
问题解答:
我来补答展开全文阅读