英语翻译Links to this change,we have decided to restructure the

问题描述:

英语翻译
Links to this change,we have decided to restructure the operational organization which is in line with supply chain operation and TPM long term direction.Mr.Ma,current Operational Production Manager will take additional responsibility of maintenance management,here is maintenance organization reporting structure:
1.Mr.Li,current Mechanical Maintenance Supervisor,will be responsible for both line 1 and line 2’s mechanical related maintenance and projects,directly reports to Morgan Ma.The mechanical maintenance group of Mr.Lan,Gu,Zhao,Liu,and Sun will continue to report to Li directly.
2.Mr.Li,current Electrical Maintenance Supervisor,will be responsible for both line 1 and line 2’s electrical related maintenance and projects,directly reports to Ma.Mr.Gao ,Fu and Huo will continue to report to Li directly.
Mr.Qi,current HSE and Operational Improvement manager,will continue to be responsible for spare parts improvement project and also provide technical coach and guidance to the maintenance team.Mr.Cui will continue to report to Qi.
Mr.Liu,current Process Engineering Manager,will take fully responsibility of recycle project to work together with project team.
In term of overall Capax and Engineering Projects Management,I will temporally take over until we have the Engineering Leader in place.
1个回答 分类:英语 2014-12-09

问题解答:

我来补答
Links to this change,we have decided to restructure the operational organization which is in line with supply chain operation and TPM long term direction.Mr.Ma,current Operational Production Manager will take additional responsibility of maintenance management,here is maintenance organization reporting structure:
与这次变化联系起来看,我们已经决定重新调整操作组织的结构,使之与供应链操作以及TPM的长远目标相一致.现任生产运营经理马先生将负责维护管理的其他方面,下面是维护组织报告结构:
1.Mr.Li,current Mechanical Maintenance Supervisor,will be responsible for both line 1 and line 2’s mechanical related maintenance and projects,directly reports to Morgan Ma.The mechanical maintenance group of Mr.Lan,Gu,Zhao,Liu,and Sun will continue to report to Li directly.
1.李先生,现任技术维护总监将负责1线和2线技术相关维护工作及各项目,直接向马摩根报告.
2.Mr.Li,current Electrical Maintenance Supervisor,will be responsible for both line 1 and line 2’s electrical related maintenance and projects,directly reports to Ma.Mr.Gao ,Fu and Huo will continue to report to Li directly.
2.李先生,现任电力维护总监,将负责1线和2线的电力相关维护工作及各项目,直接向马报告.高先生,付先生和霍先生将继续向李先生报告.
Mr.Qi,current HSE and Operational Improvement manager,will continue to be responsible for spare parts improvement project and also provide technical coach and guidance to the maintenance team.Mr.Cui will continue to report to Qi.
齐先生,现任HSE以及运营提效经理,将继续负责零部件(提高)项目,同时为维护团队提供技术指导.崔先生将继续向齐先生报告.
Mr.Liu,current Process Engineering Manager,will take fully responsibility of recycle project to work together with project team.
刘先生,现任过程工业经理,将继续与项目团队一起为循环项目负全责,
In term of overall Capax and Engineering Projects Management,I will temporally take over until we have the Engineering Leader in place.
就整体Capax以及工程项目管理方面,我将暂时代管,直到找到新任工程领导位置.
 
 