The set of projects consists of 4100 generated activity-on-node networks with 30 activities and random activity durations and costs,and with a well-considered topological network structure using indicators presented in Tavares et al .翻译通顺,最起码让我知道是什么意思,复制粘贴的就算了
These Monte-Carlo simulation runs use the settings for the generalized beta distributions to generate activities running behind or ahead of schedule 还有这个
The set of projects consists of 4100 generated activity-on-node networks with 30 activities and random activity durations and costs,and with a well-considered topological network structure using indicators presented in Tavares et al .翻译通顺,最起码让我知道是什么意思,复制粘贴的就算了
These Monte-Carlo simulation runs use the settings for the generalized beta distributions to generate activities running behind or ahead of schedule 还有这个