英语翻译Weekly report includes train conditions,faults reported,

问题描述:

英语翻译
Weekly report includes train conditions,faults reported,work done,equipment replaced and daily working time in a week.Format of report regarding work and activity control should be co-finalized by both parties.
Monthly report includes achievement (for example no delay in a month),percentage completion of work,performance summary of train,faults review and statistic in a month,fault analysis,corrective actions,spare parts shortages and supplement advice,facilities conditions (adjustment,lubrication,parts replacement etc),and reaching target of Safety and Quality.
The payments due to the Service Provider shall vary in accordance with the level of performance achieved.The criteria against which the level of performance shall be measured and the corresponding payment adjustments are detailed in Chapter 2 below.
The performance payment adjustment scheme for availability (refer to Chapter 7.2) as shall commence on the first month after the commencement of the Maintenance Services and to all subsequent months until the completion of the Maintenance Services.
The monthly DP value will be reset to zero at the beginning of each month.Whenever a Relevant Event happens,the corresponding DP of the Relevant Event will be added to the monthly DP value.At the end of each month,the net DP value will be calculated and used to determine the Service Provider's performance in that month.
1个回答 分类:英语 2014-11-15

问题解答:

我来补答
周报在一个星期包括火车情况、缺点报告的,工作被完成的,设备被替换的和每日工作时间.应该由两个党co完成报告格式关于工作和活动控制.
月度报告在一个月包括成就(例如没有延迟在一个月) ,百分比工作完成,火车业绩汇总,缺点回顾和统计,故障分析、惩治行为、备件短缺和补充忠告,设施情况(调整、润滑,零件替换等) 和到达安全和质量的目标.
付款由于服务提供者将变化与达到的表现符合的水平.表现的水平措施的标准和对应的付款调整在第2章详述下面.
表现付款调整计划为可及性(参见第7.2章)和在第一个月将开始在维修业务的开始以后和到所有随后月直到维修业务的完成.
月度DP价值将被重新安排到零在每个月初.每当一个相关的事件发生,相关的事件的对应的DP 将增加到月度DP价值.在每个月的结尾,网 DP价值在那个月将被计算并且用于确定服务提供者的表现.
希望对你有用!
 
 